Federal and state infrastructure spending, highway projects, truck parking, and freight bottlenecks on the routes drivers run.
15 stories, newest first

The Pacific Maritime Association and ILWU Local 26 reached a tentative contract agreement on Saturday covering about 250 watchmen who control terminal-gate access and run security patrols at the ports of Los Angeles and Long Beach, averting a strike set for 12:01 a.m. that morning. Local 26 is only about 2% of the ILWU workforce at the ports, but longshoremen were expected to honor its picket lines, which would have shut down cargo operations at terminals handling the majority of Long Beach cargo and about a third of Los Angeles cargo. The deal, reached under federal mediation, is subject to ratification; the existing contract will be extended while members vote, and no terms were disclosed.

The South Carolina Department of Transportation celebrated completion of the I-26/I-95 Interchange Improvement Project on Nov. 19, six months ahead of schedule. Two new flyover ramps replace the old cloverleaf's loop ramps, the interchange ramps were fully reconstructed with improved acceleration and deceleration lanes, new bridges carry I-95 over I-26, and the final flyover — I-95 northbound to I-26 westbound — opened the night of Nov. 19, in time for the holiday travel season.

ATRI's Cost of Congestion 2026 Update, released Nov. 18, puts 2024 highway congestion costs at $128.2 billion — the third straight year above $120 billion — with 1.24 billion hours of delay equal to more than 450,000 drivers idled for a year, 6.66 billion gallons of diesel wasted at a cost of $25.04 billion, and an average cost of nearly $8,000 per truck.

MDOT will close five rest areas for the winter starting Dec. 1 through April 12, 2027 — the St. Ignace Rest Area on southbound I-75 in Mackinac County, Topinabee on northbound I-75 and Hebron on southbound I-75 in Cheboygan County, Ludington on northbound US-31 in Mason County and Hart on southbound US-31 in Oceana County — with entrances barricaded and buildings locked, while the majority of its 61 rest areas remain open.

The U.S. Department of Transportation says 10 of the 297 Safe Streets and Roads for All projects it announced Thursday will help address the truck parking shortage. The Trucker's review of the full awards list found only four projects that specifically reference truck parking — in Pecos and Reeves County, Texas, Fort Collins, Colorado, and Miami Township, Ohio — and every one of them is corridor work, a study, or a plan.

The Pacific Maritime Association and ILWU Local 26 agreed Oct. 30 to extend the watchmen's contract through Wednesday afternoon, averting a walkout that could have halted vessel, yard and gate operations at terminals handling 85% of Long Beach cargo and 33% of Los Angeles cargo. Significant differences, including wages, remain.

The terminal, opened Oct. 29 by Gov. Brian Kemp and the Georgia Ports Authority, handles up to 200,000 containers a year with truck access from I-85 and I-985. Shippers can choose rail for heavier, cheaper moves or truck-only for speed — GPA expects 26,000 containers to shift to rail in year one.

The Port of Long Beach set an all-time record in September at 997,177 TEUs, up 25%, and Los Angeles posted 1,042,652 TEUs as national imports hit a September record of 2,546,261 TEUs. Truck dwell stayed fluid at 3.18 days while rail dwell hit 7.19 days, pushing boxes onto trucks and tightening Southern California's long-haul lanes.

The INFRA awards fund new and expanded parking at ports, rest areas, and border crossings — including about 500 spaces at five Pilot locations in Tennessee and 305 near the Los Indios port of entry in Texas.

Up to 14 companies share more than $500,000 in the first phase to shift deliveries to 7 p.m.–6 a.m.; the city wants 62,000 daily trucks moved off peak hours by 2040.

The new Wyoming location adds six diesel bays, four showers, a CAT Scale, and a dog park; Love's says it has added 1,314 truck parking spaces so far in 2026.

Busiest month in the port's 118-year history, with the July-to-September quarter also a record.

Mobile resumed regular schedules Saturday; four Florida ports and part of the Gulf Intracoastal Waterway stay in recovery.

The Build More Caucus wants states to be able to allow commercial activity at rest areas facing severe shortages — parking ranked No. 4 in ATRI's 2025 industry survey.

INFRA grants announced Oct. 1 back 12 projects in 12 states — including I-4 in Florida, a Wichita bypass projected for 5,000 trucks a day, and a top-100 bottleneck in Louisiana.